About Us

About Us, Jamestown began profiling plates with a 10m x 3m Combined Plasma / Oxy Profiler in Inchicore, Dublin in the mid 1990’s. The company was originally related to a steel stockholding business and offered its services in conjunction with the sale of steel sections. Since then, through strong growth and re-investment in cutting edge technology, coupled with a broadening of machine processes, Jamestown is the primary steel service centre in the Republic of Ireland. Our management and staff have the flexibility, skills and knowledge to ensure that your enquiry or your order will be dealt with in a timely and professional manner.

We are fully aware that most of our customers may already have in-house equipment themselves, but our reliability, turnaround-time, competitiveness, range and expertise means that we are a valuable sub-contract engineering partner to companies of all sizes and in many sectors.

From our beginnings in Inchicore, Dublin to our current site in Portarlington Co. Laois, we have always kept the same philosophy. We offer top quality, cost effective services and products and give the customer as much support, assistance and attention as possible. By doing this we have ensured repeat business year after year and a client list of which we are proud.

We welcome you to our site and invite you to contact us today.

Jamestown Timeline

1994

Jamestown was created by the Sherling Steel Group in July 1994 located at Jamestown Inchicore.

1994

Added 10mx2.5m Profiling machine with one Plasma torch and two Oxy torches.

1999

Stopped producing Cladding and focused on Profiling. Added two Plasmas and a dedicated Oxy Profile machine.

2001

Added a second Oxy machine and another plasma profiler, a two Headed HT2000 HySpeed.

2003

Out grew the space at Inchicore and moved to Newbridge, Co. Kildare, 25,000 Sq. foot factory space on 0.6 of a hectare site.

2004

Added another Oxy and Plasma machine, press brakes and Radial drills.

2007

Added a T&I Automated Beam Welding Line to the facilities and began producing plates girders and cellular beams.

2008

Achieved Certification to ISO9000.

2013

Added 25,000ft2 of Fabrication space in Dublin.

2013

FPC Certification to Execution Class 4 by SCCS.

2014

QMS Certification by UKAS, ISO9001.

2015

Moved business to Portarlington to 100,000 ft2 facility on a 9 hectare site.

2016

Added additional equipment and machinery, T&I Lines, Cranes.

2016

NHSS20 Certification.

2017

Extended Plasma/Oxy/ Drilling facilities, (2 x 30m Cutting beds, 24x4m 2xTorch Plasma added).