4th August 2017

by Jamestown

Jamestown supplied an unusually large Weathering Steel Half-through Bridge for the rebuilding of a railway bridge in Bolton, contributing to an essential infrastructure project.

A Vital Bridge Project

Working with infrastructure specialists J. Murphy and Sons Ltd., Jamestown delivered large bespoke bridge components for the bridge carrying Orlando Street in Bolton over the Manchester railway line. The bridge was being replaced as part of Network Rail’s regional electrification project.

5th June 2017

by Jamestown

2 x 80T Bridges being loaded in our yard after a successful Trial erection. Great teamwork with Whittens Haulage and Gabriel O’Brien cranes.